The model has been developed by Pulse Tidal Ltd with financial backing of £878,000 from the Government. When it is in the water the pulse generator will be capable of generating up to 0.15MW and will be one of the first tidal power machines to supply the national grid. If it is successful, it will be used to develop larger 1MW units which could be deployed in arrays each generating up to 100MW, enough to power the equivalent of 70,000 homes.
The prototype will be positioned off the south bank of the Humber at Upper Burcom near Stallingborough. It will work by extracting energy from underwater currents in a manner similar to wind turbines. Energy from tidal flows will power a pair of straight horizontal hydrofoils, 11 metres in length, which will move up and down like a dolphin's tail.
John Hutton said:
"Our continued support for these emerging technologies is essential if the UK is to cement its position as a world leader in marine.
"I have made clear our commitments to renewable energy and to marine technologies. We will be doubling the support available for those technologies under the Renewables Obligation. This kind of tidal project, if proven, will go some way to helping the UK meet its ambitious targets for clean, green energy.
"I wish Pulse Tidal every success in the trials."

Go to previous story

Email to a friend
Print article